So, I was working on a design specification document for a new list in SharePoint. As I often do, I was using an Excel worksheet to help me with the analysis from the requirements document. I had created a column in the spreadsheet to enter the likely column names for the list. But, as I was going down the rows, I was surprised when Excel started doing my work for me.
Full Post: http://wp.me/p3exGi-6G