Case Study Using a Variable Flow Chiller in a Central Plant

Опубликовано: 17 Октябрь 2024
на канале: AABC, ACG, EMA: Leaders in Building Performance
390
4

Speaker: Gaylon Richardson, TBE, CxA, from Engineered Air Balance Co., Inc.

This case study covers a central plant serving chilled water to Air Handling Units in the central plant, a medical office building, and a hospital. This presentation will cover an overview of the system operation with three 1250 ton chillers and an overview of the bypass system and how to size bypass valves. Attendees will learn why the owner and engineer wanted to add a temporary chiller.