In this tutorial, we have described that how to remove the schedule log file that can’t be created in primavera p6.
it will happen when i deleted some data from my system and i also delete the schedule log from the system mistakenly. and when I was updating the schedule at that time this error occurred and i was unable to schedule the Programme of works.
So I think to share this with you people to save your time and efforts.
Please Like, Share, Comment and Subscribe to our channel.
Planning P6.
Planning – P6 Channel videos Link:
/ planningp6
50- How to use Filldown Option in primavera p6 | Copy and duplicate activities values in p6 | primavera
• How to use Fill down Option in primav...
51- How to Assign and Remove Multiple Resources in Primavera P6 Schedule | Multiple Activities P6 | Tips
• How to Assign and Remove Multiple Res...
52- How to Assign Cost Loading from Excel to Primavera P6 Import and Export | Tips and Tricks | Planning
• How to Assign Cost Loading from Excel...
53- How to add Assign and change Resource Rate Type in Primavera P6 | Add resource Rates in P6 | P6 |
• How to add Assign and change Resource...
54- How to Assign Overtime Factor to Resources in primavera P6 | Calculate overtime cost in primavera p6
• How to Assign Overtime Factor to Reso...
55- What is the difference between Retained Logic and Progress Override and Actual Dates in Primavera P6
• What is the difference between Retain...
56- How to track and trace out of sequence activities in primavera p6 | apply filter in p6 | Planningp6
• How to track and trace out of sequenc...
57- How to assign and change Relationships by using Excel to primavera P6 | lag and type relationships
• How to assign and change Relationship...
58- How to Assign and change and remove Relationship of activities from Gantt Chart in Primavera P6 | P6
• How to Assign and change and remove R...
59- How to Use Trace Logic In Primavera P6 | Save Layout and Print Trace Logic | Planning P6 | Projects
• How to Use Trace Logic in Primavera P...
60- How To Add Assign Calculate Est Weight Apply Top Down Estimation In Primavera P6 | Weightages | p6 |
• How To Add Assign Calculate Est Weigh...
61- How to Create Assign and filter Activity Codes in Primavera P6 | Activity codes for schedule P6 |
• How to Create Assign and filter Activ...
62- How to Create Assign Group and Sort Project Codes in Primavera P6 | Create Filters for Project code
• How to Create Assign Group and Sort P...
63- How to Renumber Activity IDs To Arrange Activities in Primavera P6 | Change Activity IDs | Tips P6
• How to Renumber Activity IDs To Arran...
64- How to Show Customize and Print WBS Chart View In Primavera P6 | Print Setup | P6 Tips and Tricks |
• How to Show Customize and Print WBS C...
65- How to do Resource Leveling in Primavera P6 | Level overallocation of Resources in P6 | Planning P6
• How to do Resource Leveling in Primav...
66- How to Add and create column Total Budgeted Units In primavera P6 by using Global Change option p6
• How to Add and create column Total Bu...
67- How to create activities in excel and import to primavera p6 | Add export activities p6 | Planningp6
• How to create activities in excel and...
68- How to remove individual selected multiple and all relationships from activities in primavera p6
• How to remove individual selected mul...
69- How to remove the schedule log file error in primavera p6 | Tips and Tricks Primavera | PlanningP6 |
• How to remove the schedule log file e...
#logfileerror,#errorp6,#primaverap6