How to assemble ATS (Automatic Transfer Switch) with LVD (Low volt disconnect)
So in this video, how to assemble ATS (Automatic Transfer Switch) with LVD Low volt disconnect.
when our battery is set at the upper limit, for example: 13.8 volts, the inverter will automatically turn on
and when our battery is set at the lower limit for example: 12.2 volts then the inverter will be off and
ATS will automatically turn ON PLN
So the conclusion is that the Lvd will work to detect the lower limit and upper limit of the battery
according to what we want, how much will we set so that the AKI / BATTERY will last a long time because it doesn't drain out 100%, it only drains 50% and the remaining 50% is directly charged
Tools used:
1. 12 volt dc relay
2. Relay ac 220 volts
3. NCB 2 pieces
4. Cable is sufficient
5. Pilot lamp 2 pieces
6. Cable terminals
7. LVD module (low volt disconnect)
May be useful....
Don't forget to "like" and "subscribe" friends because I will UPDATE the next video - the latest knowledge videos can also be shared with friends ... if you want to share innovations and knowledge..
-------------------------------------------------- -----
For Sponsorship/Endorsement
to email: [email protected]
-------------------------------------------------- ------
*) How to Setting Low voltage disconnect (LVD)
• Cara Setting Low voltage disconnect (...
Track Info:
Music By NCS: Alan Walker - Fade [NCS Release]
• Video
#How to assemble ATS (Automatic Transfer Switch) with LVD
#LowVoltDisconnect
#AutomatiTransferSwitch
#PLTS
#ATSSOLARPANEL