Sometimes one connection needs to be replace by another one, and user is looking for the quickest way to replace several (not to say a lot of) connections at the same time. In this video, we show how to replace a simple CBAR connection by a CBUSH+CBAR+CBUSH configuration
The user-defined feconfig file for this demo can be retrieved in the link below (requires an AltairOne account):
https://community.altair.com/communit...
Please also review the link below to retrieve information about supported locations for your user-defined config file:
https://2022.help.altair.com/2022.1/h...
0:00 Introduction
0:55 Read, understand an modify the feconfig file
3:15 Save a user-defined config file
4:00 Absorb connectors from CBAR elements
5:02 Apply the new realization