35,000 tons of earth excavation for bridge launching - railway embankment is being excavated! | H...

Опубликовано: 22 Август 2026
на канале: Home Build Solution
28,136
1.2k

35,000 tons of earth excavation for bridge shifting - railway embankment is being removed! | Home Build Solution

►► To the ARTL construction company: https://www.arlt-bau.de
Apply and become an important part of major projects!

Welcome to Home Build Solution! In this video, we accompany the 35,000 tons of earth excavation for a bridge shifting – which represents an extraordinary disruption to rail traffic. The railway line between Marktredwitz and Neusorg was completely closed for this project. The main reason is the construction of a bypass in the Waldershof urban area. To realize this project, excavators, bulldozers, dump trucks, and over 100 employees working in shifts are required. In short: We show you the absolute madness - enjoy the video!

► Outfitter/Supplier - Bodyguards:
*Instagram -   / leibwaechter_workwear  
*Website - https://www.leibwaechter-workwear.de

► Partner - Botament:
*Instagram -   / botament_deutschland  
*Website - https://botagreen.botament.com/

*Tools in the video: https://amzn.to/3X36M8U

Inquiries for construction projects:
Email: [email protected]
https://home-build-solution.de/

Inquiries for collaborations:
Videoproduktion Peter-Hermani GbR
Daniel Hermani & Benjamin Peter
Email: [email protected]

All links marked with (*) are advertising; the partner receives a commission or a fixed fee for sales made through these links.