www.corigy.com
CORIGY supplied 150MWp solar mounting structure for large-scale commercial ground solar power station in 2019.
This project used CORIGY best seller:CP-KC Series Aluminum PV Mounting Structure.
With the simplest installation request from customer side, CORIGY factory assembled almost the components,so the workers at site just need to connect the main part then finish the installation,which speed up the installation speed much more.
The project is in design planning in 2019. More than 100MWp capacity has already been installed during 2019.Construction and operation process of the whole project is expected to be completed during 2020.
It’s one of the biggest reference of CORIGY CP-KC mounting for such a big utility of solar power plant.
This solution used at the 150MWp project is with many kinds of advantages such as fast construction speed, high adjustability, good anti-corrosion performance,easy to install, strong and durable.
If you have projects need mounting system,please contact us at Email:[email protected]