2. Types of Testing Methodology in Tamil | Difference between Waterfall and Agile Model | LMTI

Опубликовано: 07 Апрель 2026
на канале: LMTI - Learn More Training Institution
179
4

#learnmoretrainings #lmti #manualtesting #tamiltutorial #manualtestingtamil #waterfallmodel #agilemodel

All the sessions are interlinked so go in the order which mentioned in playlist – LMTI wishes you a happy Learning. Feel free to post your doubts in comments session and if you feel that if any other topic need to cover let me know, Will do for you.

Notes are added below

Manual Testing Tamil Tutorials:

Class 1:    • 1. Introduction to Testing in Tamil |Why w...  
Class 2:    • 2. Types of Testing Methodology in Tamil |...  
Class 3:    • 3. Agile process followed in projects in T...  
Class 4:    • 4. General discussion on how to think & st...  
Class 5:    • 5. How to analyze the Requirement document...  
Class 6:    • 6. How to do testing design with BDD Gherk...  
Class 7:    • 7. JIRA in Tamil- Scrum Process | Scrum Bo...  
Class 8:    • 8. STLC - Software Testing Life Cycle - Re...  
Class 9:    • 9. Types of Testing in Tamil -Unit, Smoke ...  
Class 10:    • 10. Why to do Regression Testing in Tamil ...  
Class 11:    • 11. Defect Life cycle in Tami | Manual Tes...  
Class 12:    • 12. Mapping of Test Case and defect  in Ji...  
Class 13:    • 13. Priority & Severity in defects | Calls...  
Class 14:    • 14. General Testing Terms in Tamil & other...  
Class 15:    • 15. Test Design Techniques in Tamil | LMTI  
Class 16:    • 16. How to Handle Live Defect | Root Cause...  
Class 17:    • 17. Test Metrices | RTM | Clarification / ...  

-------------------------------------------------
Live session Notes:
Testing Methodology :

1. Waterfall Model
2. Agile Model

House Plan ---Civil Engineer ---Design-- Construction ---- Final Check

client need - Business Analyst - Requirement -- Developer -- QA

Waterfall Model : Traditional Approach

Requirement will be fixed

phase by Phase

After Developing the entire application


Agile Model (Modern Approach) - Change in requirement

Development + Testing Activity parallel

CAR - 1 Lakh parts

1 by 1 - As per design manufacture - boult & nut

Assemble :
----------------------------------------------
Additional Notes :
-------------------------------------------------
Waterfall Model (Fixed Model)

When the software industry started the first model which was used is Waterfall Model, A very old model Traditional model also called as Linear Model

Note: Nowadays we are not using this model in any of software industry

The waterfall methodology is a linear project management approach, where stakeholder and customer requirements are gathered at the beginning of the project, and then a sequential project plan is created to accommodate those requirements. The waterfall model is so named because each phase of the project cascades into the next, following steadily down like a waterfall.

The Phases of the Waterfall Model

Requirement Analysis

Design

Implementation (Development Activity)

Testing

Maintenance
-------------------------------------------------
Agile methodology:

Incremental testing is used in agile development methods and hence, every release of the project is tested thoroughly. This ensures that any bugs in the system are fixed before the next release.

Advantages

It is possible to make changes in the project at any time to comply with the requirements.

This incremental testing minimizes risks.

Disadvantages

Constant client interaction means added time pressure on all stakeholders including the client themselves, software development and test teams.
-------------------------------------------------
"Be a part of LearnMore to learn more and earn more"

Training From the professional
For Admission contact +91 9677569832
mailto:[email protected]

#learnmoretraininginstitution #lmti #learnmoremadurai #learnmorekochi #learntesting
--------------------------------------------------

Disclaimer This channel does not promote or encourage any illegal activities. All contents provided by this channel for GENERAL AND EDUCATIONAL PURPOSE ONLY. Copyright disclaimer under section 107 of the copyright act 1976, allowance is made for "fair use policy" for purposes such as criticism, comment, news reporting, teaching, scholarship and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use. Subscribe, Like , share and comment Thank you for watching

Follow us on

LinkedIn :   / learn-more-training-institution  
Instagram :   / learnmoretraininginstitute  
Facebook :   / learnmoretraininginstitute