CHECKLIST FOR EXCAVATION & P.C.C.
Final plinth levels of all buildings.
Strata as per consultant’s specifications.
The size of the holes is further than the size of P.C.C., & depth as asked.
Shuttering provided, if required.
Uniformity & thickness of soling.
Compaction of concrete.
The thickness of P.C.C. is specified.
Curing for 7 days.