Inspection checklist for EXCAVATION & P.C.C. | Civil Engineering

Опубликовано: 31 Июль 2026
на канале: Engineers Blog
561
13

CHECKLIST FOR EXCAVATION & P.C.C.

Final plinth levels of all buildings.
Strata as per consultant’s specifications.
The size of the holes is further than the size of P.C.C., & depth as asked.
Shuttering provided, if required.
Uniformity & thickness of soling.
Compaction of concrete.
The thickness of P.C.C. is specified.
Curing for 7 days.