Ulwe Coastal Road Drone Update Dec 2025 | 70% Complete | NMIA Link

Опубликовано: 29 Июнь 2026
на канале: Sky Shots
95,656
1.8k

Ulwe Coastal Road’s December 2025 DRONE update is finally here — and the progress is bigger than ever.

This seven-kilometre coastal corridor will completely transform Navi Mumbai’s connectivity, linking:
Atal Setu (MTHL)
Navi Mumbai International Airport (NMIA)
JNPT Port & Industrial Belt
Ulwe, Dronagiri & Coastal Zones

Backed by high-precision DRONE footage and detailed engineering breakdowns, this documentary takes you inside the most complex parts of the project:

What This DRONE Documentary Covers

✔ 5.8 km elevated stilt-based design
✔ 1.2 km stretch modified after Bombay High Court environmental ruling
✔ 3,728 mangroves protected with 3X compensatory plantation
✔ Why the budget jumped from ₹700 crore → ₹1,591 crore
✔ Soft soil works, bored piles & cofferdams
✔ Pile-bent vs pile-cap piers explained visually
✔ Precast segment launching + post-tensioning demo
✔ Deck slab & expansion joint installation
✔ Ulwe Node integration & Panvel Creek long-span design
✔ Airport interchange — Atal Setu to NMIA in 10 minutes
✔ Current status: 65–70% complete
✔ Estimated completion: August 2026

This is not just a progress update — it’s the full engineering story behind one of India’s most ambitious coastal projects.

⭐ WHY THIS VIDEO IS DIFFERENT
Unlike generic update videos, this documentary:
Shows real engineering logic, not just drone shots
Explains why Bombay High Court changed the design
Breaks down every construction method used on site
Uses 3D animations + drone visuals to show how things actually work

#UlweCoastalRoad #dronefootage #navimumbai #infrastructureindia #nmia