India's Defense Satellites Over View | CARTOSAT Importance | TEJAS Dual Pylon + GsH Trials

Опубликовано: 01 Июнь 2026
на канале: Defence Decode
58,071
2.6k

Studies to develop a vehicle capable of delivering 600 kg payload to 550 km Sun-synchronous orbit from SHAR began in 1978. Among 35 proposed configurations, four were picked and by November 1980, a vehicle configuration with two strap-ons on a core booster (S80) with 80 tonne solid propellant loading each, a liquid stage with 30 tonne propellant load (L30) and an upper stage called Perigee-Apogee System (PAS) was being considered

===================================================
WHOMSOEVER IT MAY CONCERN
Most of the pictures clip or BGM included in the Video Belongs to their Respected Owners and we do not claim rights...but under this👇 we are using them 🙏

===================================================
DISCLAIMER: UNDER SECTION 107 OF THE COPYRIGHT ACT 1976, ALLOWANCE IS MADE FOR "FAIR USE" FOR PURPOSES SUCH AS CRITICISM, COMMENT, NEWS REPORTING, TEACHING, SCHOLARSHIP, AND RESEARCH. FAIR USE IS A USE PERMITTED BY COPYRIGHT STATUTE THAT MIGHT OTHERWISE BE INFRINGING. NON-PROFIT, EDUCATIONAL OR PERSONAL USE TIPS THE BALANCE IN FAVOR OF FAIR USE.


Facebook ►   / indiatubedesk  
Twitter ►   / indiatubedesk  

ˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍˍ

SOURCE► #DefenceDecode
DDR TEJAS TRIAL REPORT
http://delhidefencereview.com/2019/11...

====================================================
THANKS FOR WATCHING,
PLEASE LIKE SHARE AND SUBSCRIBE TO THE DEFENCE DECODE
====================================================