Construction continues. The foundations are dry, so it's time to build the crawl space and the concrete slab floor that will support the house.
On the agenda: installing the drains, conduits, joists, infill blocks, and insulating panels. Then it's the concrete slab's turn to be poured. We'll show you all of this in a timelapse.
We'll also give you an update on our biggest challenge: the low-voltage power line that runs above the future house.
Masonry company: DCL Toutes Constructions (Pelleport - 31)
Concrete: Concrete Ramp
Also check out our adventures around the world on Smartrippers: / @smartrippers
00:00 Introduction
00:52 Rising the crawl space
01:27 Installing the joists and infill blocks
02:02 Drainage and conduits
03:43 Pouring the concrete slab
04:32 Summary and information
************************************ My name is Flo, and with my wife Sandrine, we embarked on building our own house. I show you everything in videos: my tips, advice, but also my struggles and what not to do. Join us on Sundays at 11:00 AM for a new video!
🛎 Subscribe so you don't miss the next one!!
------------------------------------------------------------------
Intro music: Joakim Karud – Wait a Minute
------------------------------------------------------------------
#construction #building #house #floor #crawlspace #smartbuilders