This is our latest project GCing. This was a Jack and Jill master bath that we converted to a master bath only for this PA homeowner. We used the old entrance to make three closets. Check out the project from start to finish here! Chapters for reference:
0:00 Introduction
0:40 Demolition
1:41 New alcove/ drop in tub install
1:52 Framing
2:30 Closet Framing (converting old entrance)
3:01 Plumbing begins
3:56 Walk-around describing work done so far
7:12 Plumbing continues
7:38 Electrical begins
7:48 Shower pan install
8:00 More framing
8:31 Baseboard heat reconfig
8:46 Sheetrock installation
9:15 Bath fan exhaust
9:26 Back to sheetrock
11:04 Strengthening the floor (two layers of plywood)
11:20 Back to sheetrock
11:30 Installing lighting and switches (electrical)
11:48 More sheetrock and sheetrock waterproofing
12:12 Install recessed lighting
12:54 Installing radiant floor
13:12 Finishing shower waterproofing
13:20 Walk-around after first coat of joint compound
14:10 Walk-around after second coat of joint compound
14:41 Installing floor tile
15:00 Cat inspecting progress
15:24 Shower waterproof membrane
15:35 Wall tile begins
16:53 Trim plumbing
17:10 Walk-around almost done!
18:26 More plumbing trim
18:45 Last bit of wall tile
19:12 FINAL PHOTOS BEFORE AND AFTER!!!
Thank you for watching, big thanks to my friend Santiago and his team who took care of all the finishing.