Testing a load cell has 4 steps:
1- Assembly
2- Preparation for Test
3- Test
4- On-site
Load Cell tested for:
Project name: Bitlis Stream Viaduct
Contractor: Demce Yapı İnşaat San. Tic. A.Ş.
Manufacturing Company: PYES Yapı Sanayi Tic. A.Ş.
Bridge Type: Orthotropic Bridge / Incremental Launch Method
Location: Bitlis/TURKEY
Span Length: 90 m
Total Length: 900 m
Test Location: Özdekan Kauçuk A.Ş.
#loadcell #bridge #test