How to replace a 100 AMP Load Center

Опубликовано: 20 Март 2026
на канале: Erik Asquith
53,213
239

In this video we walk through the process of replacing a 100 AMP 20 Circuit Bryant Load Center with a 100 AMP General Electric 32 Circuit Load Center. Unfortunately my camera ran out of batteries when I started the process of installing the circuits in the new GE panel. I have included pictures of the final product at the end of the video.

In this video I also walk through:
Disconnecting the electrical meter
Verifying the power has been disconnected from the Load Center
Disconnecting the service lines from the Load Center
Disconnecting all circuits (hot/neutral/ground) from the Load Center
Removing the old Bryant 20 Circuit 100 AMP Load Center
Removing and install a new backer board
Mounting a new GE 32 Circuit 100 AMP Load Center
Attaching the service lines to the new Load Center
Working with EMT conduit and fittings
Grounding the Load Center to a copper water main (please follow your local codes that may require grounding rods)
Installing your circuits (hot/neutral/ground) into the new Load Center (please note my camera ran out of batteries at this part)
Installing Arc Fault Circuit Interrupter (AFCI) - pictured at end of video,
Installing Ground Fault Circuit Interrupter (GFCI) - pictured at end of video
Installing Whole House Surge Protector (SPDs) - pictured at end of video

Note, before proceeding with any electrical work:
Always ensure electricity is turned off and disconnected where possible
Be sure to pull a permit and have your work inspected for your own safety
Please familiarize yourself with and follow all national and load electrical codes
Consult with or contract a licensed electrician for any work you are not comfortable with performing yourself
-Be safe and wear the proper clothing, shoes/boots, gloves, safety gear, and use use the properly tools
If you get to a point where you a stuck, consult with or contract a licensed electrician