Quiz time! Today we're featuring a PjM Mock Exam question from ARE Live!

Clip from ARE Live: Project Management Mock Exam | ARE 5.0 PjM Exam (   • ARE Live: Project Management Mock Exam | A...  )

🔍 Scenario: The mechanical engineer for the project is working towards their design development set when the structural engineer flags that one of their ducts is too large to penetrate a beam at the depth noted in the structural drawings. The mechanical engineer insists the deadline is too near to coordinate this item, and ignores the structural engineers request.

There are 2 weeks before the DD submission, how should the architect advise the team to proceed?

A. The mechanical engineer is justified and this should be coordinated in CD documents based on the time constraint.

B. The Architect should advise the structural engineer that this should have been flagged sooner and delay the DD submission as needed.

C. Remind the structural engineer that they are required to coordinate with other consultants, and given that there are 2 weeks until the deadline, this leaves adequate time.

D. The mechanical engineer is not required to coordinate with the structural engineer – this is the role of the architect.

👇 Drop your answer - A, B, C or D - in the comments!