InstalSystem 5 - BOM per project, storey or building unit

Опубликовано: 20 Июнь 2026
на канале: InstalSoft Global
157
2

With InstalSystem 5 you can decide if the bill of materials should be generated for the whole project, seperately for each storey or seperately each building unit. This can be controlled seperately for each of designed installations (heating&cooling, tap water, waste water).