The full manual fluidized bed dip powder coating process for guard railing typically involves the following steps:
1.Surface preparation: Clean and prepare the guard railing to ensure a smooth and clean surface for coating.
2.Preheat the guard railing to 400℃
3.Dipping in fluidized bed: Submerge the guard railing in the fluidized bed containing the powder coating material.
4.Removal and heating: Lift the coated guard railing out of the fluidized bed and cure the coating.
---------------------
powder and fluidized bed producer: pecoat.com
---------------------
#powdercoating
#dippowdercoating
fluidizedbedpowder