In this video I will tell you about the second day of installing warm water floors ... Enjoy your viewing! Friends THANKS for supporting us in the construction site, LIKE and write advice and just GOOD WORDS!
PAUL DID:
1st) LEVELING THE FLOOR NEXT LAYING RUBEROYD
2nd) we pour sawdust 15 cm thick, throttle them and wait about a few days for the sawdust to take its shape,
3) AFTER I FILLED 10 CM LAYER OF CONCRETE FLOOR
4th) further as the first ...
Manufacturing technology for underfloor heating in the house:
1. Preparation of the base (fill the floor according to the level of the lighthouses)
2. On top of the concrete base, lay a mesh with a mesh of 15 + 15 mm, possibly 5 + 5 mm. I used a galvanized welded mesh with a rod thickness of 0.3 mm, the price is 140 rubles, one mesh is 0.4 mm, 180 rubles, as you prefer.
5. The underfloor heating pipe is laid on the grid with a pitch of 12-15 cm. I used the pipe Valtec Pex-Evoh 16x2 mm. price 48-58 rubles in different stores
6. The tube is fastened with plastic clamps (ties), 100 mm in size. more is possible, I bought more economically.
7. I pour a concrete screed 40-60 mm thick. The proportions of concrete are as follows - cement: sand: red broken brick - 1: 3 :. Cement M500. TWO BUCKETS OF RED BRICK.
This warm floor in the house will be connected to the gas heating system KOTEL KUTURAMI.