This technology can be used to construct foundation piles up to 4 m in diameter and 100 m deep.
Cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile.
The bored piles construction entails two main steps, the drilling phase (Demolition - Removal - Stabilisation) and the construction phase (Reinforcing cage - Casting - Curing)
The bored piles construction entails two main steps, the drilling phase (Demolition - Removal - Stabilisation) and the construction phase (Reinforcing cage - Casting - Curing