JOHN G MUNSON Last Laker into Duluth

Опубликовано: 16 Июль 2026
на канале: alaricdogface
1,327
43

JOHN G MUNSON arrives in Duluth to lay up for the winter at the port terminal. She is the last ship to go under the lift bridge until spring. The Coast Guard cutter SPAR is seen breaking ice and clearing a path for the Munson. Time of arrival is 8:13 AM.

Name of ship JOHN G MUNSON
Flag United States (USA)
Length 768' 03" (234.17m)
Beam 72' 00" (21.95m)
Depth 36' 00" (10.97m)
Midsummer Draft 27' 04" (8.33m)
Unloading Boom Length 250' (76.2m)
Capacity 25,550 tons
Engine Power 7,000 bhp diesel
Owner/operator Key Lakes Inc./Great Lakes Fleet