MCN (Material Credit Note) (RVPN specific process)

Опубликовано: 18 Май 2026
на канале: umeshjbs
493
6

The complete MCN process is as under:
i) Create MCN in system using T-code ZMMMCN with reference to Survey report already approved.
ii) After saving the document, user can change & view the same.
iii) When it seems MCN filled by user is correct then he has to submit the same (T-code ZMMMCN).
iv) User has to take print of system generated submitted MCN (T-code ZMMMCN).
v) Place seal and signature on system generated MCN printout.
vi) Present the same to ACOS for deposition of material.