Earthing system consist of good joint of copper cables which is laid below our building structure or surrounding of building or substation /switchyard. This video shows the correct method of joints, testing and burial of connected cables.
8 Software Development Tools: UI Design Software
Role Play: Tax Planning for Advisors Coffee Meeting
Dröps of Jüpiter (Jesse Bloch Edit)
Cool Backyard Science Experiments to Try With Your Kids
Тюнинг фар Wrangler JL
El último trayecto de Horacio Dos-Eduardo Mendoza
UHC RUN Pero Gano con Manzana de Noch Universocraft
Qual o melhor Sistema Operacional para Programar? (Perguntei para os especialistas!)
5 Ton crane load test in 132kV GIS Room. @ElectricalSubstation.
Transformer 50MVA Water Deluged test
#MV cable Sheath high voltage test 10kV DC #electrical #VLF KIT
Laser cutting machine
132kV GIS INSTALLATION
132 kV High voltage cable dressing and termination at transformer side
Exothermic welding, Exothermic bonding or Exothermic molding of Copper cable for Earthing
Lightning ⚡🌩️ protection rod installed on roof area to protect Electrical equipments.
33kV Cable termination /connection in GIS basement and fire sealant
500MVA TRANSFORMER1
132kV ( HV CABLE) cross section details.
SF6 Gas filling in 33kV GIS