When this station was first constructed, technical limitations meant the elevated station has to be built at a height of 15 meters above city streets. However, it created steep gradients on the viaducts approaching the station from both sides, and that caused passenger discomfort and wearing out of trains. To address them, we need to lower the station to 10 meters above ground to create a smoother track profile.
You can learn more about how we did it here: / long_post_how_to_manually_lower_an_elevated
Join our new discord server: / discord
Support us on Patreon and get perks: / projectfirmament