IBM Storage Fusion HCI System - RU 20 Assembly

Опубликовано: 16 Май 2026
на канале: Tricia Jiang
326
1

For non racked Storage Fusion systems, you will need to attach air ducts onto 9155-S01 and 9155-S02 switches. These videos are step by step procedures to install the air duct into the 9155-S01 (High Speed switch).
The first video describes the installation for 9155-S01 in Rack Unit 20 (RU 20).

This similar procedure is also used to install the air duct into 9155-S01 (Management switch).