Episode 19: John is onsite for the biggest pour of our build: the rooftop deck concrete pour. The LiteDeck ICF panels are ready to go and the 2x2 foot rebar grid is in place for the massive concrete pour. Troubles start right away as a form moves on the crew. They work quickly to rectify the problem and keep the concrete pumping. The roof is poured and the crew starts to smooths and finish the concrete. Now we wait the 30 day period for the concrete to dry. After that, we can remove the forms and our entire roof will be in place with not a single column holding it up!
Channel overview: John and Leslie take you step by step on the journey of building their new home on Table Rock Lake. The house is an ICF (insulated concrete form) home with suspended garage floor and concrete decks. This all takes place on a sloped lot, where the fun never ends. From septic to backfill headaches, join them on their journey to build a home on their dream lake lot on Table Rock Lake!
Contractors and suppliers in this episode:
Tri Lakes Concrete
Rost Pumping
LiteDeck ICF Roof Panels
Xypex Concrete Additive (waterproofing)
Area Information:
Table Rock Lake Chamber of Commerce
https://www.visittablerocklake.com