[AP3D] Tutorial New Project (Project Setup, List Property, Line No.Tag)

Опубликовано: 16 Июль 2026
на канале: AP3D-KH (AutoCAD PLANT 3D)
1,117
19

#autocadplant3d #Listproperty #Newproject #Projectsetup
1. New Project
Name : SAMPLE (STABILIZER AREA)
Units : Metric - Inches (Mixed Metric) , P&ID Symbology Standard : PIP

2. List Property (P&ID, P3D)
Spec : P1 (CS 3.2 ASME 150 # RF ~232)
U1 (CS 1.6 ASME 150 # RF ~232)
U2 (CS 2.5 ASME 150 # RF ~400)
U3 (CS 1.6 ASME 150 # RF ~399)
U4 (304L SS 0.8 ASME 150 # RF ~149)
U2G (CS 2.5 ASME 150 # RF ~85 U/G)
Service : P (Process Hydrocarbon)
DF (Dry Flare)
CWR (Cooling Water Return)
CWS (Cooling Water Supply)
LS (Low Pressure Steam)
LC (L.P Steam Condensate)
CD (Steam Condensate)
IA (Instrument Air)
N2 (Nitrogen)
PA (Plant Air)
UW (Utility Water)
Insulation : H (Hot)
P (Personal Protection)
E (Electric Traced)

Line No. (Annotation Tag) : 6"-P-1000-P1-H(50)
Size-Service-No.-Spec-Insulation(Insul.Th'k)
sample_PipeTag
#(TARGETOBJECT.SIZE)-#(PIPELINEGROUP.SERVICE)-#(PIPELINEGROUP.LINENUMBER)-#(TARGETOBJECT.SPEC)
sample_PipeTag-Insul
#(TARGETOBJECT.SIZE)-#(PIPELINEGROUP.SERVICE)-#(PIPELINEGROUP.LINENUMBER)-#(TARGETOBJECT.SPEC)-#(TARGETOBJECT.INSULATIONTYPE)#(TARGETOBJECT.INSULATION)

P&ID & 3D DWG Line No. Tag : P-1000 (Service-No.)