Join this channel to get access to perks:
/ @628dirtrooster
This job was done back in March. I had to go back for a second one three weeks ago. This time the building was stripped out with no A/C units and all the windows closed. The air was stagnant and thick with dust from cosmetic demolition, probably full of asbestos and lead, to the point it was hard to breathe. We were under extreme heat advisories and the temperatures inside this old building were almost unbearable. Initially I wasn't sure I could even make it to the room I had to work in. Even the young men working on the demolition project were struggling. When I got to my destination in the building I had to sit down and take a breather just from climbing the stairs with arm loads of equipment. I was literally looking to see which windows might open or which I would break out should it come to a survival issue. I worked in that dusty sauna for almost five hours and drank over a gallon of water while I was there, never once having to use the bathroom. I got all my work done and also made some construction workers really happy with the gift of all the free wall honey.
In the end it was a good day and another enjoyable road trip through the back roads and small towns of Mississippi and Louisiana.
Music is from Epidemic Sound:
Day of Mine - Biddy Sullivan
The River's Gonna Cry When You're Gone (Instrumental Version) - Loving Caliber
Ambient Sun - Cerulean Skies
Follow the Light - Johan Glossner