This $118 Million interchange reconfiguration was initiated to create a smoother, more efficient transition for heavy airport traffic flow on the Beachline Expressway. GRL Engineers provided GRLWEAP Wave Equation Analysis for pre-construction, the Pile Driving Analyzer (PDA) during pile construction, and CAPWAP Analysis after installation. The project was completed eight months ahead of schedule. See the full study at https://www.grlengineers.com/case-stu...