Signal Control without Block Detectors (Video

Опубликовано: 13 Март 2026
на канале: IoTT
2,796
like

What I find most annoying when it comes to signal controlled model railroad operations is implementing isolated block sections so that the control system can know where the trains are. It requires quite some planning, considerable efforts for wiring and the resulting complexity makes it hard to find problems if things do not work as planned. I’m not interested in that so I thought it’s time to come up with a smarter approach.

If you like my work, please consider supporting it with a donation:
https://www.paypal.com/biz/fund?id=Y2...

Tindie page for IoTT Stick, Interface Boards and Function Hats: https://www.tindie.com/stores/tanner8...

MyIoTT.org (landing page under construction): http://myiott.org/

Table of Content
0:00 Introduction
0:45 Welcome
1:00 Train Shed and Garden Railroad
2:02 Outdoor Block Detector Challenge
2:35 Requirements
3:15 Six Step Workflow
4:02 Step 1: Lay the track
5:03 Step 2: Measuring the track network
6:01 Step 3: Operations model
7:05 Step 4: Configure signals and turnouts
8:14 Step 5: Deploy the Operation model
8:53 Step 6: Run the trains
10:30 So, what's new?
11:22 Outlook