View the recent improvements made at the Ackley Wastewater Treatment Plant from above! This drone footage highlights the enhancements CGA assisted with to serve the City of Ackley and protect our environment.
Project Achievements:
-The addition of a 32,000 Cubic Yards SAGR Digestor, enhancing the system's performance.
-3,030 feet of new sanitary sewer pipe, ensuring a robust and reliable wastewater management system.
Two flow splitters and seven manhole structures, improving maintenance and inspection operations.
-Ultraviolet water treatment for safer, cleaner water discharge.
-250 kW generator and three blowers, ensuring uninterrupted operation.
-Lagoon Treatment Overhaul: Installed a baffle curtain and 36 aerators, significantly improving the efficacy of lagoon treatment.
-Infrastructure Improvements: Removed outdated structures and rerouted farm drainage to enhance the system's effectiveness.
-Resilience Building: Re-lined the equalization basin, reinforcing the plant's durability and operational reliability.