You have voted in the community area for a signal plan on the model railway from Lukas.
I use only Viessmann signals (entry signal, exit signal, block signal).
costs according to Viessmann UVP:
-► http://bit.ly/2vgNwNN
signal plan from Lukas:
-► http://bit.ly/2vk9fEs
Viessmann signals: -
entry signal: http://bit.ly/31BycYg
exit signal: http://bit.ly/2SBS6OS
block signal: http://bit.ly/2tNkdCg
Thank you for watching, we hope you enjoy this video.
Follow us!
Facebook:
► / minemodellbahn ◄
Instagram:
► / minemodellbahn ◄