Polytunnel Foundation Tubes

Опубликовано: 31 Март 2026
на канале: Premier Polytunnels
29,059
79

Foundation Tubes are driven into the ground at each end of each hoop when building a polytunnel on a soil base.
It is important to take time ensuring that all measurements, spacings and levels are correct - this will set the perfect foundation for your polytunnel.
In this video we show you how to set the four corner tubes - always checking for square - followed by the two rows of foundation tubes. When foundation tubes are in position on a level site, only the swaged section should be protruding from the ground.

This video also shows you how to position Cover Tensioning Tubes (optional extra/addition). Cover Tensioning Tubes are fixed using the same method as standard foundation tubes, but with 8in left protruding from the ground.

Polytunnel Construction FAQ’s - https://www.premierpolytunnels.co.uk/...

Discover more about Polytunnels on our website – https://www.premierpolytunnels.co.uk/ - or call the team on 01282 811250.

Let's Get Social!
Facebook -   / premierpolyt.  .
Twitter -   / polytunnelsales  
Instagram -   / premierpoly.  .
Pinterest -   / prempolytunn.  .
Join our mailing list - https://www.premierpolytunnels.co.uk/...

Subscribe to our YouTube channel now!