THE STEEL FRAME CAFE WHEN COMPLETED WILL LOOK LIKE?

Опубликовано: 02 Сентябрь 2026
на канале: Universal Steel Buildings
257
6

Area: 15m x 30m.
Location: Rach Gia, Kien Giang.
Total construction time: 4 months.
Scope of work: consultation, design, manufacturing, transportation, installation, interior decoration, and warranty.

With pre-engineered steel structure techniques, the steel-framed café will have no intermediate columns, maximizing efficient space utilization and allowing flexible seating arrangements. Furthermore, the use of steel frames has shortened the construction time, with a total project duration from consultation to handover within 4 MONTHS.

Learn more about our pre-engineered steel buildings solution at:
🌐 Website: usbuildingsgroup.com
📧 Email: [email protected]
➤ Fanpage:   / usbuildingsofficial  
➤ Linkedin:   / universal-vietnam-steel-buildings  
➤ Instagram:   / usbuildings_official  

#preengineeredsteelbuildings #usbuildings #steelframe #cafeshop #steelstructurebuilding #prefabricated