CLOSE-UP OF THE CONSTRUCTION PROCESS OF A STEEL FRAME OFFICE BUILDING

Опубликовано: 17 Июль 2026
на канале: Universal Steel Buildings
133
3

Scale: 7 floors, 1 ground floor, 6 upper floors
Location: Phu Nhuan District, Ho Chi Minh City
Total Execution Time: 5 months
Scope of Work: Design, fabrication, shipping, erection and warranty

As the HEADQUARTERS of US Buildings, this project utilizes a robust steel frame system combined with concrete to provide load-bearing capacity and enhance the durability of the structure. Moreover, the use of steel structures helps create spacious, open areas and optimize the workspace to foster an efficient working environment.

Don't forget to subscribe to our YouTube channel to see more outstanding projects and useful industry knowledge today!
🌐 Website: usbuildingsgroup.com
📧 Email: [email protected]
➤ Fanpage:   / usbuildingsofficial  
➤ Linkedin:   / universal-vietnam-steel-buildings  
➤ Instagram:   / usbuildings_official  

#usbuildings #preengineeredsteelbuildings #steelstructure #prefabricatedbuildings #office #steelframeofficebuildings