How Atlassian increased on-time delivery to 90% with Float 📈

Опубликовано: 20 Июнь 2026
на канале: Float
191
3

The production team at ‪@Atlassian‬ struggled with late deliveries–only 40% of work was delivered on time because of avoidable causes like long feedback cycles and deadline changes. Using Float, their Resource Manager Emily detected the bottlenecks and worked with her team to reduce them, quickly leading to a staggering 90% delivery rate on due dates—a huge win that she’s very proud of (as she should be!).

Read the full story → https://www.float.com/customers/atlas...