Hydro Demo Replaster Prep process vs Bond Coat Protocol

Опубликовано: 25 Июль 2026
на канале: GM Pools
400
0

Which is better? Check back to find out which process is better!
Multiple processes utilizing Bond Coat are being tested against our Hydro Demo Replaster Prep process in this test. The pull off test will be performed 28 days after plaster is installed. The test will be performed again 1 calendar year later to see if either process weakens after under water for a year. The tests are designed to determine the bond strength of either process.