POV: Excavating a HS2 tunnel portal in Birmingham

Опубликовано: 22 Октябрь 2024
на канале: HS2 Ltd
4,011
104

Behind the scenes at our Washwood Heath portal.

The 22-metre portal is the deepest of four tunnel portals on the Midlands section of the route. The first of two tunnelling machines building the tunnel from Water Orton will break through the portal wall later this year.

Follow us on social media:
Twitter:   / hs2ltd  
Instagram:   / hs2ltd  
Facebook:   / hs2ltd  
LinkedIn:   / high-speed-two-hs2-ltd  

#HS2 #Construction #engineering #birmingham #tunnel

If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].