Accropode is developed in 1981 by French Sogreah. The material is concrete, which is cast in one-time by the fixed formwork.
The precast of accropode usually adopts the shaped composite steel formwork, and each set of formwork is assembled by 2 mutually symmetrical units. The concrete is stratified into the mold in layers and vibrated by interted vibrator. After pouring, the plaster is compacted. Under the normal temperature (25ºC), the mold is dismantled and maintained after 20h. Prefabrication process: formwork inspection and cleaning → brushing release oil → formwork installation → concrete placement → demoulding → repair and maintenance → component stacking.
The accropode structure is divided into two types: A-type and B-type accropode. Compared with B-type, A-type accropode is shorter and fatter with chamfered ribs, and A-type is firmer and easier to demould. B-type block is thinner and taller. It has longer legs and is difficult to demould, which is only for small tonnage block.
Mould Fabrication, Assembly of Halves, Volume Test, Blasting, Painting, Logistics of Acropode Moulds of sizes
Whatsapp/Wechat/Tel:
+008618630205975
(Sale1,Lucy) since 2006