This video is fresh off the press and includes an example at the end from a pre-site inspection completed today (of racked units). We typically wait a while before posting prior videos, but this actually posted from the today visit (pre-inspection).

Photos are mixed This is an example of the steps taken from a site development that we showed you from the past couple months complete, to testing pre-actual energization to automation testing to racking to install to final pre-approval for plug in post energization and sign off from the utility (consuming phase). There is a lot involved.