1500MX Installation - Flood, Washdown and MQL Setup - Part 2

Опубликовано: 02 Июнь 2026
на канале: Tormach Inc.
4,239
51

Learn more about the Tormach 1500MX CNC mill at https://hubs.ly/Q03jwtDN0 - powered by our free PathPilot software https://hubs.ly/Q03jwzXD0.

The second part of the 1500MX Installation is now here. It covers everything after the first part, which you can watch here:    • 1500MX Installation - Unboxing through Ope...  

This covers the setup of the flood, washdown coolant, and the MQL systems.

Intro 00:00
Powering Up the 1500MX 00:33
Setting up the Coolant Tank and Pump 02:09
Install the Y-Axis Washdown 05:37
Install the Flood Coolant Ring 07:24
Install the Manual Sprayer 10:31
Make Coolant Connections 12:19
Install the Washdown Pump 13:12
Install the Coolant Hoses and Fittings 13:33
Install the Washdown Coolant Filter 14:21
Install the Washdown Bars 15:14
Install the Minimum Quantity Lubrication System 16:28
Route the MQL Tubing 17:14
Mount the MQL Pump 18:31

Interested in a Tormach machine? Schedule a call with one of our team members at https://hubs.ly/Q029gf-H0 and they will be happy to answer any questions you have.

Be sure to subscribe for updates on everything Tormach: https://goo.gl/sWeCs7

Join the Tormach Forums here: https://hubs.ly/Q029ggRV0

There are several ways to contact Tormach Technical Support.

If you want technical support, please follow these instructions to open a support ticket: https://hubs.ly/Q029ghcD0

Tormach Technical Support page: https://hubs.ly/Q029ghwW0

Tormach Technical Support contact: https://tormach.atlassian.net/service...

About Us: At Tormach, we're dedicated to providing exceptionally engineered products, technical support, and customer service at the lowest possible cost. Our focus is to help you realize your CNC goals through tools and resources that transform your concepts into real products. Connect with us:

Visit our website: https://hubs.ly/Q029gj8M0

1500MX Installation - Flood, Washdown and MQL Setup - Part 2