HS2 has announced a significant milestone at Long Itchington Wood Tunnel in Warwickshire – the first deep tunnel on the high-speed route to complete its civil engineering phase.
The development at the one-mile-long twin-bore tunnel – which will carry the railway into the West Midlands – sees vital elements, including three cross passages, concrete finishing works and base slabs, and emergency and maintenance walkways complete.
It comes before the internal fitting out of the tunnel with the complex systems needed to operate the high-speed line including the power, track and signalling.
The tunnel is the first of five twin-bore tunnels on the HS2 project to reach this vital stage. In all, 27.4 miles of the route between London and the West Midlands are in deep, twin-bore tunnels.
Find out more about HS2: https://www.hs2.org.uk/
Follow us on social media:
Twitter: / hs2ltd
Instagram: / hs2ltd
Facebook: / hs2ltd
LinkedIn: / high-speed-two-hs2-ltd
#HS2 #Construction #Train #Rail #Infrastructure #HighSpeed #tunnel
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email [email protected].