http://www.eon-fx.com Eon-FX was engaged to project document the construction of the 'Lighthorse Interchange' on the Westlink M7 project, west of Sydney. We used two cameras and mounted them on top of a 44m pole, set up as a panorama. We don't expect to be doing another panorama time-lapse soon as matching frames, clouds, lighting etc. between the cameras was almost impossible. This is the daytime version. There is also a nightime version.