The design and preparation process of the new metro line D is in full swing. A planned line has on its way in total ten stations, and one of them is station Pankrac. The mined metro station with a complex system of transfer halls and with a connection to the current metro line C.
The webinar introduces the initial static design and modeling procedure regarding unfavorable geotechnical conditions. Finally, a brief overview of the current design and construction work on metro line D is given.