Chair 7 replaced a Riblet quad that was installed in 1990. This lift was installed in 2017, the first lift on the mountain by Skytrac, and the newest lift at Mt. Baker. It is also the only lift to replace anything other than a double chair at the resort.
Recorded on January 15th, 2024
Insta360 X3