#APT #Hornby #oorail
Moving the capacitors in the new Hornby APT coaches to the gangway above the bogie can cause the coaches to derail. While testing both the location above the bogie and the location under the floor, I discovered when the capacitor was placed above the bogie it caused a derailment. The capacitor being above the bogie caused the side of the bogie on the connected coach to lift up around curves regardless of the speed.
In this video I show you how to fix this problem, and how the bogie mechanism works. You can find the capacitor fix video here:
• Hornby APT Coach Capacitor Fix | oorail.com
Website - http://www.oorail.co.uk
Twitter - / oorail
Facebook - / oorail
Trackside3D - http://trackside3d.co.uk
Copyright (c) 2022 oorail.com
Search keywords:
oorail oorail77 oorail.com model railways BR British Rail British Railways